Tag
|
Original part number
|
Name
|
Req. Qty
|
Price (1 pc.)
|
|
---|---|---|---|---|---|
1 |
6X4-42103-0B-00 |
Tiller Handle Kit LM | 1 | quote request | |
2 |
6X4-WS42B-01-4D |
Handle, Steering | 1 |
17 876 ¥ $115.59 |
|
3 | 93700-06M03-00 | NIPPLE, GREASE | 1 |
283 ¥ $1.83 |
|
4 | 6X4-48215-00-00 | Graphic | 1 |
567 ¥ $3.67 |
|
5 |
6X4-42119-01-00 |
Grip, Steering Handle | 1 |
2 354 ¥ $15.22 |
|
6 | 6X4-42177-00-00 | Rubber, Handle | 1 |
1 046 ¥ $6.76 |
|
7 | 6X4-42137-00-00 | Indicator, Throttle | 1 |
316 ¥ $2.04 |
|
8 | 6X4-41291-00-00 | BUSHING | 1 |
534 ¥ $3.45 |
|
9 |
6X4-44139-01-00 |
COLLAR | 1 |
1 243 ¥ $8.04 |
|
10 |
90152-05011-00 |
Screw, Countersunk | 1 |
109 ¥ $0.70 |
|
11 | 91490-20010-00 | Pin. Cotter | 1 |
153 ¥ $0.99 |
|
12 | 6X4-44177-00-00 | WASHER | 1 |
105 ¥ $0.68 |
|
13 | 6X4-42128-00-00 | Collar, Distance 1 | 1 |
578 ¥ $3.74 |
|
14 | 90501-23215-00 | SPRING, COMPRESSION | 1 |
251 ¥ $1.62 |
|
15 | 6X4-44188-00-00 | WASHER | 1 |
174 ¥ $1.13 |
|
16 | 90386-08032-00 | BUSH | 1 |
164 ¥ $1.06 |
|
17 | 63D-42126-00-00 | Friction, Steering Handle Grip | 1 |
796 ¥ $5.15 |
|
18 | 6X4-48154-00-00 | KNOB, THROTTLE | 1 |
2 354 ¥ $15.22 |
|
19 | 95380-06600-00 | Nut, Hexagon | 1 |
76 ¥ $0.49 |
|
20 | 91490-20010-00 | Pin. Cotter | 1 |
153 ¥ $0.99 |
|
21 |
6X4-44100-01-00 |
Shift Link Assy | 1 |
39 458 ¥ $255.14 |
|
22 | 6X4-42115-00-00 | . .Shaft, Steering Handle | 1 |
10 420 ¥ $67.38 |
|
23 | 6X4-44102-00-00 | . .Shift Assist Assy | 1 |
14 606 ¥ $94.45 |
|
24 | 6X4-14137-00-00 | . .Clip | 1 |
196 ¥ $1.27 |
|
25 | 69W-48261-00-00 | . Arm, Throttle | 1 |
5 515 ¥ $35.66 |
|
26 | 6X4-82540-00-00 | . .Neutral Switch Assy | 1 |
8 916 ¥ $57.65 |
|
27 |
98580-03014-00 |
. .Screw 3 | 2 |
142 ¥ $0.92 |
|
28 | 6X4-42821-00-00 | . .Band, Clamp | 3 |
109 ¥ $0.70 |
|
29 | 97095-08040-00 | BOLT | 1 |
382 ¥ $2.47 |
|
30 |
92990-08600-00 |
WASHER | 1 |
120 ¥ $0.78 |
|
31 |
97080-06030-00 |
BOLT | 2 |
207 ¥ $1.34 |
|
32 |
92990-06600-00 |
WASHER | 1 |
76 ¥ $0.49 |
|
33 |
6H1-48321-21-00 |
CABLE | 1 |
6 802 ¥ $43.98 |
|
34 | 6X4-48538-00-00 | Clamp, Cable 1 | 1 |
556 ¥ $3.60 |
|
35 | 6X4-26367-00-00 | PROTECTOR | 1 |
316 ¥ $2.04 |
|
36 | 90464-09M42-00 | CLAMP | 1 |
273 ¥ $1.77 |
|
37 | 97095-06014-00 | BOLT | 1 |
120 ¥ $0.78 |
|
38 | 63D-48538-00-00 | Clamp, Cable 1 | 1 |
327 ¥ $2.11 |
|
39 | 90468-1005-00 | CLIP | quote request | ||
40 |
6H3-48321-02-00 |
CABLE | 1 |
6 802 ¥ $43.98 |
|
41 | 6X4-48538-10-00 | Clamp, Cable 1 | 1 |
556 ¥ $3.60 |
|
42 | 6X4-26367-00-00 | PROTECTOR | 1 |
316 ¥ $2.04 |
|
43 | 97095-06014-00 | BOLT | 1 |
120 ¥ $0.78 |
|
44 | 63D-48538-00-00 | Clamp, Cable 1 | 1 |
327 ¥ $2.11 |
|
45 | 90468-10005-00 | CLIP | 1 |
251 ¥ $1.62 |
|
46 | 6X4-42159-00-00 | STAY | 1 |
2 878 ¥ $18.61 |
|
47 |
6X4-44159-00-8D |
Handle, Gear Shift | 1 |
6 736 ¥ $43.56 |
|
48 | 6X4-44173-00-00 | Lever, Shift Control | 1 |
785 ¥ $5.08 |
|
49 | 97780-60920-00 | SCREW, TAPPING | 2 |
240 ¥ $1.55 |
|
50 | 6G8-44191-00-00 | Indicator, Shift | 1 |
578 ¥ $3.74 |
|
51 | 90386-26MA3-00 | BUSH | 2 |
567 ¥ $3.67 |
|
52 |
6X4-42131-09-00 |
Cover, Handle Steering | 1 | discontinued | |
53 | 97885-06040-00 | Screw, Pan Head | 1 |
164 ¥ $1.06 |
|
54 |
92990-06600-00 |
WASHER | 1 |
76 ¥ $0.49 |
|
55 |
98580-06016-00 |
Screw, Pan Head | 6 |
185 ¥ $1.20 |
|
56 |
92990-06600-00 |
WASHER | 6 |
76 ¥ $0.49 |
|
57 |
6X4-42725-01-00 |
GROMMET | 1 |
894 ¥ $5.78 |
|
58 | 65W-42121-11-4D | BRACKET | 1 |
15 696 ¥ $101.49 |
|
59 | 90101-12014-00 | BOLT | 1 |
1 493 ¥ $9.65 |
|
60 | 92990-12200-00 | WASHER, PLAIN | 1 |
164 ¥ $1.06 |
|
61 | 90206-12M22-00 | WASHER, WAVE | 1 |
556 ¥ $3.60 |
|
62 | 90387-12M02-00 | COLLAR | 1 |
1 199 ¥ $7.75 |
|
63 | 90201-12035-00 | WASHER, PLATE | 2 |
185 ¥ $1.20 |
|
64 | 90386-12003-00 | BUSH | 2 |
360 ¥ $2.33 |
|
65 | 92990-12600-00 | WASHER, PLATE | 1 |
109 ¥ $0.70 |
|
66 | 90185-12M12-00 | Nut, Self-Locking | 1 |
1 025 ¥ $6.63 |
|
67 | 6X4-41728-10-00 | CAP | quote request |
This catalog contains parts for outboards YAMAHA RIGGING 20 (0405) PARTS 2006 RIGGING PARTS BREAKDOWN 2006 year.
Average processing time in Japan is about 1 week after payment.
After the spare parts have arrived at our warehouse, you will be able to create a package (specify the data for shipment, choose a delivery method) — we will pack and inform the delivery cost. You pay, and we will send the package to you with a tracking number.
If you have questions about work — please do not hesitate to ask our manager by mail info@