Tag
|
Original part number
|
Name
|
Req. Qty
|
Price (1 pc.)
|
|
---|---|---|---|---|---|
1-1 | 51103-03B30 | DAMPER ASSY, FRONT FORK RH MODEL K2/K3 |
48 723 ¥ $337.11 |
||
1-2 | 51103-03B50 | DAMPER ASSY, FRONT FORK RH MODEL K4 | 1 |
53 628 ¥ $371.05 |
|
2-1 | 51104-03B30 | DAMPER ASSY, FRONT FORK LH MODEL K2/K3 |
48 723 ¥ $337.11 |
||
2-2 | 51104-03B50 | DAMPER ASSY, FRONT FORK LH MODEL K4 | 1 |
53 628 ¥ $371.05 |
|
3 | 51110-03B30 | .TUBE, INNER RH | 1 |
12 644 ¥ $87.48 |
|
4 | 51120-03B30 | .TUBE, INNER LH |
15 151 ¥ $104.83 |
||
5 | 51130-03B30 | .TUBE, OUTER | 2 |
19 293 ¥ $133.49 |
|
6 | 51167-03B30 | .BUSH, GUIDE | 2 |
458 ¥ $3.17 |
|
7 | 51121-03B30 | .BUSH, SLIDE | 2 |
392 ¥ $2.71 |
|
8 | 51153-03B30 | .SEAL, OIL | 2 |
741 ¥ $5.13 |
|
9 |
51168-38A00 |
.SPACER, SEAL | 2 |
512 ¥ $3.54 |
|
10 | 51156-03B30 | .RING, STOPPER | 2 |
109 ¥ $0.75 |
|
11 | 51173-03B30 | .Seal, Dust | 2 |
719 ¥ $4.97 |
|
12 | 51190-03B30 | .CYLINDER | 2 |
20 819 ¥ $144.05 |
|
13 | 51172-03B30 | ..GUIDE, SPRING | 2 |
610 ¥ $4.22 |
|
14 | 51129-03B30 | ..Nut |
109 ¥ $0.75 |
||
15 | 51170-03B30 | .BOLT, CENTER | 2 |
9 265 ¥ $64.10 |
|
16 | 51177-36E20 | ..O RING | 2 |
142 ¥ $0.98 |
|
17 | 51175-03B30 | ..O RING | 2 |
109 ¥ $0.75 |
|
18 | 51171-03B30 | .SPRING, FRONT (K=0.26) |
1 853 ¥ $12.82 |
||
19 | 51351-03B30 | .BOLT, FORK | 2 |
11 118 ¥ $76.93 |
|
20 | 51357-27C40 | ..BOLT, PLUG | 2 |
283 ¥ $1.96 |
|
21 | 51117-19C10 | ...O RING | 2 |
142 ¥ $0.98 |
|
22 | 51117-36E00 | .O RING | 2 |
164 ¥ $1.13 |
|
23 | 51501-03B00 | PROTECTOR, RH |
6 159 ¥ $42.61 |
||
24 | 51511-03B00 | PROTECTOR, LH |
6 159 ¥ $42.61 |
||
25 | 09103-06256 | BOLT | 6 |
65 ¥ $0.45 |
|
26-1 | 51171-03B40 | SPRING, FRONT (K=0.24) OPT,SOFT |
4 142 ¥ $28.66 |
||
26-2 | 51171-03B50 | SPRING, FRONT (K=0.28) OPT,HARD | 2 |
1 853 ¥ $12.82 |
|
26-3 | 51171-SHOWA-003 | SPRING, FRONT (K=0.30) OPT,HARD | quote request | ||
REFER TO FIG.29A(E- 8) FOR | |||||
MODEL K5/K6 |
This catalog contains parts for motorcycles SUZUKI RM85L 2006 year.
Average processing time in Japan is about 1 week after payment.
After the spare parts have arrived at our warehouse, you will be able to create a package (specify the data for shipment, choose a delivery method) — we will pack and inform the delivery cost. You pay, and we will send the package to you with a tracking number.
If you have questions about work — please do not hesitate to ask our manager by mail info@