Tag
|
Original part number
|
Name
|
Req. Qty
|
Price (1 pc.)
|
|
---|---|---|---|---|---|
1 | 17910-MJ4-000 | CABLE A, THROTTLE | quote request | ||
2 | 17920-MJ4-000 | CABLE B, THROTTLE | quote request | ||
3 | 17950-MJ4-000 | CABLE, CHOKE | quote request | ||
4 |
17962-KE8-701 |
LEVER, CHOKE | 1 |
1 199 ¥ $8.30 |
|
4 | 17962-KE8-701 | LEVER, CHOKE | 1 |
1 199 ¥ $8.30 |
|
5 |
35130-MJ4-672 |
SWITCH ASSY., STARTER ENGINE STOP | quote request | ||
5 |
35130-MJ4-672 |
SWITCH ASSY., STARTER ENGINE STOP | quote request | ||
5 | 35130-MJ4-672 | SWITCH ASSY., STARTER ENGINE STOP | quote request | ||
7 |
35152-KE8-703 |
PLATE, STOP SWITCH SETTING | 1 |
414 ¥ $2.86 |
|
7 | 35152-KE8-703 | PLATE, STOP SWITCH SETTING | 1 |
414 ¥ $2.86 |
|
8 |
35200-MJ4-671 |
SWITCH ASSY., TURN SIGNAL | quote request | ||
8 | 35200-MJ4-671 | SWITCH ASSY., TURN SIGNAL | quote request | ||
10 | 35204-KE8-702 | PLATE, TURN SIGNAL SWITCH SETTING | 1 |
567 ¥ $3.92 |
|
11 | 53141-422-000 | PIPE, THROTTLE GRIP | 1 |
905 ¥ $6.26 |
|
12 | 53165-422-000 | GRIP, R. HANDLE | 1 |
1 003 ¥ $6.94 |
|
13 |
53166-422-305 |
GRIP, L. HANDLE | 1 |
1 155 ¥ $7.99 |
|
13 | 53166-422-305 | GRIP, L. HANDLE (COO) | 1 |
1 155 ¥ $7.99 |
|
14 | 64211-MJ4-000 | STAY, MIRROR MOUNTING | discontinued | ||
15 | 64212-MA3-770 | RUBBER, MIRROR MOUNTING | quote request | ||
16 | 88110-MJ4-003 | MIRROR, R. | quote request | ||
17 | 88120-MJ4-003 | MIRROR, L. | quote request | ||
18 | 93500-06014-0G | SCREW, PAN (6X14) | 2 |
33 ¥ $0.23 |
|
19 | 93892-05020-07 | SCREW-WASHER (5X20) | 1 |
33 ¥ $0.23 |
|
20 | 93892-05028-07 | SCREW-WASHER (5X28) | 2 |
38 ¥ $0.26 |
|
21 | 93892-05045-07 | SCREW-WASHER (5X45) | 1 |
49 ¥ $0.34 |
|
22 | 93901-32120 | SCREW, TAPPING (3X8) | 2 |
27 ¥ $0.19 |
|
23 | 94021-10270-0S | NUT, CAP (10MM) | quote request | ||
24 | 94101-10700 | WASHER, PLAIN (10MM) | 2 |
38 ¥ $0.26 |
|
25 | 94111-10700 | WASHER, SPRING (10MM) (NA USE ALT:94111-10400) |
33 ¥ $0.23 |
This catalog contains parts for motorcycles HONDA VF1000R A 1985 year.
Average processing time in Japan is about 1 week after payment.
After the spare parts have arrived at our warehouse, you will be able to create a package (specify the data for shipment, choose a delivery method) — we will pack and inform the delivery cost. You pay, and we will send the package to you with a tracking number.
If you have questions about work — please do not hesitate to ask our manager by mail info@